HomeMy WebLinkAbout0119656-Building (windows)
0
OSHKOSH
ON THE WATER
Job Address 1642THORNTONDR
CITY OF OSHKOSH
No
119656
BUILDING PERMIT - APPLICATION AND RECORD
Owner BRIAN J SPAETH/LISA M TUPPER
Create Date
OS/23/2006
Designer
Contractor
WASCO - WISCONSIN ALUMINUM SUPPLY CC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
_Sq.FI.
_Sq.FI.
Rooms
Height
FI.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
_Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
. Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units 0
# Structures
0
Use/Nature SFRI Replacing 2 double hung and 1 awning style casement window in existing openings. and wrap exterior trim.
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,625.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
Date OS/23/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1317560000
In the perfonmance of this work I agree to perfonm all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a párty, if you perfonm the work
described In this penmlt application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2546 AMERICAN DR
Agent/Owner
APPLETON
WI 54914 - 0000
Telephone Number
920-730-0099
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.