Loading...
HomeMy WebLinkAbout0119656-Building (windows) 0 OSHKOSH ON THE WATER Job Address 1642THORNTONDR CITY OF OSHKOSH No 119656 BUILDING PERMIT - APPLICATION AND RECORD Owner BRIAN J SPAETH/LISA M TUPPER Create Date OS/23/2006 Designer Contractor WASCO - WISCONSIN ALUMINUM SUPPLY CC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement _Sq.FI. _Sq.FI. Rooms Height FI. D Projection I Finished/Living Bedrooms Stories Canopies Garage _Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required . Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature SFRI Replacing 2 double hung and 1 awning style casement window in existing openings. and wrap exterior trim. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,625.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: Date OS/23/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1317560000 In the perfonmance of this work I agree to perfonm all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a párty, if you perfonm the work described In this penmlt application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2546 AMERICAN DR Agent/Owner APPLETON WI 54914 - 0000 Telephone Number 920-730-0099 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.