Loading...
HomeMy WebLinkAbout0119663 P e OSHKOSH ON THE WATER Job Address 923 TAFT AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 119663 Owner RICHARD C WING Create Date OS/23/2006 Plan Contractor RAPID SOFT LLC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater 1 Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Category 411 - Residential-Water Heaters Water Softner Wait.St. Shamp Sink - Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin - Ex! Grease Trap - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Replace gas water heater for Sears "check #14724 Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1608230000 Valuation Issued By $572.00 Plan Approval $0.00 $20.00 D Permit Voided I Permit Fees Date OS/23/2006 In the perfonmance of this work. I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. If you perfonm the work described In this permit application within an easement. the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvais before starting such activity. Signature Date Address N1284 CRANDON CT Telephone Number 757-6130 AgenUOWner GREENVILLE WI 54942 - 0000 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.