Loading...
HomeMy WebLinkAbout0119662 P ~ OSHKOSH ON THE WATER Job Address 803 OTTER AVE CITY OF OSHKOSH No 119662 PLUMBING PERMIT - APPLICATION AND RECORD Owner PETER/JULIANNE A URBSCHAT Create Date OS/23/2006 Contractor GARTMAN MECHANICAL Category 441 -Industrial-Water Heaters Plan Bathtub Shower WaterSoltner Wait St. Shamp Sink Coffee Maker ~ Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin ~ Ext Grease Trap ~ Toilet Disposal Bidet Sculry Sink Wash Ftn RPZValve Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater 1 Classon Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature of Work ì'-~-"--- Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0802170000 $20.00 0 Permit Voided I $600.00 Plan Approval $0.00 Permit Fees Valuation Issued By Date OS/23/2006 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonn the work described in this permit application within an easement, the City strongly urges the penni! applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Date Address 520 W SOUTH PARK AV Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 920-231-5530 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Penmit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.