HomeMy WebLinkAbout0119662 P
~
OSHKOSH
ON THE WATER
Job Address 803 OTTER AVE
CITY OF OSHKOSH
No
119662
PLUMBING PERMIT - APPLICATION AND RECORD
Owner PETER/JULIANNE A URBSCHAT
Create Date OS/23/2006
Contractor GARTMAN MECHANICAL
Category 441 -Industrial-Water Heaters
Plan
Bathtub Shower WaterSoltner Wait St. Shamp Sink Coffee Maker
~
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin ~ Ext Grease Trap
~
Toilet Disposal Bidet Sculry Sink Wash Ftn RPZValve
Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Water Heater 1 Classon Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature
of Work
ì'-~-"---
Size
Material
Type
#
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
0802170000
$20.00 0 Permit Voided I
$600.00
Plan Approval
$0.00
Permit Fees
Valuation
Issued By
Date OS/23/2006
In the performance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonn the work
described in this permit application within an easement, the City strongly urges the penni! applicant to contact the
easement hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 520 W SOUTH PARK AV
Agent/Owner
OSHKOSH
WI 54902 - 0000
Telephone Number 920-231-5530
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Penmit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.