Loading...
HomeMy WebLinkAbout0119645- Plumbing (Storm Lateral) e OSHKOSH ON THE WATER Job Address 938 N LARK ST CITY OF OSHKOSH No 119645 PLUMBING PERMIT - APPLICATION AND RECORD Owner DANIEL R JORGENSEN Create Date OS/22/2006 Plan Contractor D.R. HANSEN PLBG. Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Category 401 - Residential-Exterior (laterals) Water Softner Wait.St. Shamp Sink - Coffee Maker Local Waste Ice Chest FlrlWstSink Int Grease Trap Clothes Wshr Exam Sink Catch Basin - Ext Grease Trap - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Use/Nature Install storm sewer lateral. "(Debit Account) of Work Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 4" Plastic New Lateral Parcelld # 1601820000 $1,500.00 Plan Approval $0.00 $50.00 0 Permit Voided I Permit Fees Date OS/22/2006 In the performance of this work, I agree to perform all work pursuant to nules governing the described constnuction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Date Telephone Number 233-1595 Address 55 KNAPP ST Agent/Owner OSHKOSH WI 54902 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.