Loading...
HomeMy WebLinkAbout0119637-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 1809 HICKORY LN Contractor LARRY HANSEN PLBG CITY OF OSHKOSH No 119637 PLUMBING PERMIT - APPLICATION AND RECORD Owner THOMAS UMARY LOU DEGNER Create Date OS/22/2006 Category 411 - Residential-Water Heaters Plan Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump 1 Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr WaitSt Ice Chest Exam Sink Shamp Sink - FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Coffee Maker Int Grease Trap Ext Grease Trap - RPZValve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Gar Drain Soda Disp REPLACE GAS WATER HEATER "CHECK #14303 Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1526040000 Use/Nature ofWork Valuation Issued By $360.00 Plan Approval $0.00 $20.00 D Permit Voided I Permit Fees Date OS/22/2006 In the performance of this work. I agree to peliorm all work pursuant to rules governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you peliorm the work described in this permit application within an easement, tI1e City strongly urges tI1e permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Date Address N-1044 TOWER VIEW DR Agent/Owner GREENVILLE WI 54942 - 0000 Telephone Number 920-757-6863 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.