HomeMy WebLinkAbout0119633-Building (patio door)
~
OSHKOSH
ON THE WATER
Job Address 2309 COMET ST
CITY OF OSHKOSH
No
119633
BUILDING PERMIT - APPLICATION AND RECORD
Owner JANA C DOEMEL
Create Date
OS/22/2006
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement - Sq. Ft. Rooms Height
Finished/Living - Sq. Ft. Bedrooms Stories
Garage - Sq. Ft. Baths
Ft.
0 Projection I
Canopies
Signs
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature SFRI Install 6' wide patio door (swinging door) in place or rear exit door.' Door to provide minimum 32" opening, is being installed in
of Work able end wall, using 2-2x10 header.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
/1?lil
Date OS/22/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1518060000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to see any necessary appro efore startin uch activity.
Signature
Address 2309 COMET ST
OSHKOSH
WI 54901 - 1957
Date,YJd)X'p
Telephone Number &20)1;)& - 5:Jcf8
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.