Loading...
HomeMy WebLinkAbout0119633-Building (patio door) ~ OSHKOSH ON THE WATER Job Address 2309 COMET ST CITY OF OSHKOSH No 119633 BUILDING PERMIT - APPLICATION AND RECORD Owner JANA C DOEMEL Create Date OS/22/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement - Sq. Ft. Rooms Height Finished/Living - Sq. Ft. Bedrooms Stories Garage - Sq. Ft. Baths Ft. 0 Projection I Canopies Signs Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature SFRI Install 6' wide patio door (swinging door) in place or rear exit door.' Door to provide minimum 32" opening, is being installed in of Work able end wall, using 2-2x10 header. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: /1?lil Date OS/22/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1518060000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to see any necessary appro efore startin uch activity. Signature Address 2309 COMET ST OSHKOSH WI 54901 - 1957 Date,YJd)X'p Telephone Number &20)1;)& - 5:Jcf8 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.