HomeMy WebLinkAbout0119632-Buidling (siding/bay window/patio door)
e
OSHKOSH
ON THE WATER
Job Address 1000 ALPINE CT
CITY OF OSHKOSH
No
119632
BUILDING PERMIT - APPLICATION AND RECORD
OWner CECIL AlSUSAN STREETER
Create Date
OS/22/2006
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
----
Plan
Type
. Building
0 Sign
0 Canopy
~~-
0 Raze
Zoning
------~
Class of Const:
Size
Unfinished/Basement
- Sq. Ft.
_Sq.FI.
Rooms
Height
Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
---
Canopies
Garage
- Sq. Ft.
Baths
----
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units ~
# Structures
0
Park Dedication
Use/Nature
ofWork
¡SFR\ Replace siding. bay window. and patio door. Door & window will be same dimensions as prior.
I
L
HVAC Contractor
Plumbing Contractor
Electric Contractor
$10,000.00 Plan Approval
$0.00 Permit Fee Paid
$74.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date OS/22/2006
FinaIlO.P..QCJ~°.!9°00
0 Permit Voided I
Parcelld # 1525250000
In the perfomnance of this work I agree to perfomn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an sement, the City strongly urges the pemnit applicant to contact the easement
holder(S)andtosecUreany~ssa'ì' ppr fore rtingsuchactivity. ~/ /
Signature ~ Date 5/22-/0 ç;;
( (
Agent/Owner
Address 1000ALPINECT
OSHKOSH
WI 54901 - 2009
Telephone Number
2 '3337 rz
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing'-Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.