Job Address 360 S WESTFIELD ST
CITY OF OSHKOSH
No
119608
ELECTRIC PERMIT - APPLICATION AND RECORD
Owner
DANIEL WINICOLE L ABRAMOVICH
Create Date 05/19/2006
Contractor HOMEOWNER
Service 0 New 0 Change 0 Temp
Volts
Amps
Appliances rM--
Category 612 - Residential-Single Family AdditionlR
Plan
eN/A
Type
0 Overhead
0 Underground
Circuits
~
4
Luminaires ~
Receptacles ~
Switches
UselNature of SFRI Remodel the existing bathroom' W.C. will be moved and a double vanity will be installed, dosets will be made smaller and a 32"
Work ~oor will be installed to the bathroom.
Fees: Valuation
-.. $1,000.00
Plan Approval
$0.00
Permit Fee Paid
$50.00
Issued By:
¿-If<;
Date 5/19/2006
0 Permit Voided I
Parcelld # 0611550000
The undersigned, in applying for an Electric Permit to perform electrical work within a single family home, owned and occupied
as the principle residence by the undersigned, hereby acknowledges per City Municipal Code Section 11-22, that other
individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the
City of Oshkosh to perform said work.
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City 01 Oshkosh has no authority to enlorce easement restrictions of which itis not a party, ilyou perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to ure any necessary approvals bel re starting such activity.
Date £:/1'//06
Agent/Owner
Signature
Address
OSHKOSH
WI 5490 - 5588
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready, .