HomeMy WebLinkAbout0119605-Building
"0
OSHKOSH
ON THE WATER
Job Address 360 S WESTFIELD ST
CITY OF OSHKOSH
No
119605
BUILDING PERMIT - APPLICATION AND RECORD
Owner DANIEL W/NICOLE L ABRAMOVICH
Create Date
05/19/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Canst:
Size
Unfinished/Basement ~ Sq. FI. Rooms Height
Finished/Living ~ Sq. Ft. Bedrooms Stories
Garage ~ Sq. FI. Baths
Ft.
D Projection:
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units 0
# Structures
0
Park Dedication
~:~:~~ure f~: w~e:~~;~~:de~st~~gb~~~~6~':.' W.C. will be moved and a double vanity will be installed, closets will be made smaller and a 32"
HVAC Contractor
Plumbing Contractor
Electric Contractor
HOMEOWNER
Fees: Valuation $1,500.00 Plan Approval
Issued By: ~
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Date 05/19/2006
FinaIlO.P. 00/00/0000
D Permit Voided I
Parcelld # 0611550000
In the perfonnance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work
described in this pennit application within an easement, the City strongly urges the pennit applicant to contact the easement
holder(s) and to se r any necessary approvals before tatting such activity.
Signature
Date
x
Address 360 S WESTFIELD ST
AgenUOwner
OSHKOSH
WI 54902 - 5588 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.