HomeMy WebLinkAbout0119612-Plumbing (relocate laundry)
~
OSHKOSH
ON THE WATER
Job Address 3241 OLD ORCHARD LN
CITY OF OSHKOSH
No
119612
PLUMBING PERMIT - APPLICATION AND RECORD
Owner JOSH M/KARLA M LEGGETT
Create Date 05/19/2006
Plan
Contractor PLUFF PLUMBING
Bathtub Shower
Whirlpool Floor Drain
Lavatory Lndry Tray
Toilet Disposal
Res. Sink Dishwasher
Bar Sink Sump Pump
Water Heater Classrm Sink
Site Drain Breakrm Sink
Roof Drain
Misc.
Fixtures
Ejector/Grind
Use/Nature
ofWork
I'=~ ~'"~
Category 410 - Residential-Interior
WaterSoftner Wail.SI. Shamp Sink Coffee Maker
-
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr 1 Exam Sink Catch Basin - Ex! Grease Trap
-
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec 1 Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
Sanitary Sewer
Conn. Type
Storm Sewer
Water Service
Size
Material
Type
#
Parcelld #
1417670000
Valuation
$400.00
Plan Approval
Issued By
$0.00
$20.00 0 Permit Voided I
Permit Fees
Date 05/19/2006
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to see e ny necessary a rovals re starting such activity.
=:-
Signature
Date
5//1/ C4
,
Address PO BOX 264
DALE
Telephone Number
779-4864
WI 54931 - 0264
To schedule inspections please call the Inspec1ion Request line at 236-5128 noting the Address, Permit Number, Type of
Inspec1ion (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the projec1 is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.