HomeMy WebLinkAbout0119616-Plumbing (auto center restroom)
ce
OSHKOSH
ON THE WATER
Job Address 900 N KOELLER ST
CITY OF OSHKOSH
No
119616
PLUMBING PERMIT - APPLICATION AND RECORD
Owner ALEXANDER & BISHOP2 LLC
Create Date 05/18/2006
Contractor R J PARINS PLUMBING AND HEATING INC
Category 440 - Industrial-Interior
Plan
Bathtub Shower Water Softner WaitSt
Whirlpool Floor Drain Local Waste Ice Chest
Lavatory 1 Lndry Tray Clothes Wshr Exam Sink
Toilet 1 Disposal Bidet Sculry Sink
Res. Sink Dishwasher Beer Tap Hand Sink
Bar Sink Sump Pump Lab Sink Plaster Sink
Water Heater Classrm Sink Sterilizer Surgeons Sink
Site Drain Breakrm Sink Dip Well F Prep Sink
Roof Drain Ejector/Grind Drink Ftn Serv Sink
Misc.
Fixtures
Shamp Sink -
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Coffee Maker
Int Grease Trap
Ext Grease Trap -
RPZ Valve
1 Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Gar Drain
Soda Disp
UselNature
of Work
Replacing fixtures for restroom byautocenter. "check #36836
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1608700101
$21.00 0 Permit Voided I
$20,800.00
Plan Approval
$0.00
Permit Fees
Valuation
Issued By
Date 05/19/2006
In the performance of this work, I agree to perform ail work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2860 W MASON
AgenUOwner
GREEN BAY
WI 54313 - 0000
Telephone Number 920-494-9159
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.