HomeMy WebLinkAbout0119611-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 2745 F HAVENWOOD DR
Contractor PLUFF PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Shower
Floor Drain
Lndry Tray
DIsposal
Dishwasher
1 Sump Pump
Classon Sink
Breakrm Sink
Ejector/Grind
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
119611
Owner RONALD UMARJORIE E POUBLON
Create Date 05/19/2006
- Cate90ry 410- Residential-Interior
Plan
1 Water Softner Wait.St. Shamp Sink - Coffee Maker
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap -
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
Use/Nature ADD BASEMENT BATHROOM AND BAR SINK
of Work
Valuation
Issued By
Sanitary Sewer
Storm Sewer
Water Service
Size
Material
Type
#
Conn. Type
Parcelld #
1632024000
$1,500.00
Plan Approval
$0.00
$28.00 D Pennit Voided I
Permit Fees
Date 05/19/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no autl1ority to enforce easement restrictions of which it is not a party, if you perform tI1e work
described in tI1is permit application within an easement, tI1e City strongiy urges tI1e pennit applicant to contact tI1e
easement hoider(s) and to secure.any necessary apQ vais b a starting such activity.
Signature
WI 54931 - 0264
Date .5 / Ie¿ /06
/ /
Telephone Number 779-4864
Address PO BOX 264
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the rêquest is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.