Loading...
HomeMy WebLinkAbout0119618-Building (siding/remove porch) e OSHKOSH ON THE WATER Job Address 2353 COMET ST CITY OF OSHKOSH No 119618 BUILDING PERMIT - APPLICATION AND RECORD Owner DEANNE BRENNAND Create Date 05/19/2006 Desi9ner Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zonin9 Class of Const: Size Unfinished/Basement ~ Sq. Ft. ~Sq.Ft. Rooms Height Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies Signs Garage ~Sq.Ft. Baths Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain - II Dwelling Units ~ Height Permit Park Dedication II Structures ~ Use/Nature of Work FR /INSTALL SIDiNG ON HOUSE (REPLACE MASONITE WiTH VINYL), REPLACE GUTTERS & DOWNSPOUTS, NON ONFORMING PORCH REMOVED' DREXLER ELECTRIC TO DO ELECTRiCAL WORK HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,800.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: /?? ú¿; Date 05/19/2006 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld 111518120000 In the perfonnance of this work I agree to perform ali work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which itis not a party, If you perfonn the work described In this permit applicaüon within an easement, the City strongly urges the permit applicant to contact the easement hoider(s} and t ec ny ec ssary approvais be re starting such activity. Signature Date ~ I /9/Zotl G Address 2347 ASHLAND ST AgenUOwner Oshkosh WI 54901 - 0000 Telephone Number t:)¿P-2.3Ç"-O2/i] To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.