HomeMy WebLinkAbout0119618-Building (siding/remove porch)
e
OSHKOSH
ON THE WATER
Job Address 2353 COMET ST
CITY OF OSHKOSH
No
119618
BUILDING PERMIT - APPLICATION AND RECORD
Owner DEANNE BRENNAND
Create Date
05/19/2006
Desi9ner
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zonin9
Class of Const:
Size
Unfinished/Basement
~ Sq. Ft.
~Sq.Ft.
Rooms
Height
Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
Signs
Garage
~Sq.Ft.
Baths
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain -
II Dwelling Units ~
Height Permit
Park Dedication
II Structures
~
Use/Nature
of Work
FR /INSTALL SIDiNG ON HOUSE (REPLACE MASONITE WiTH VINYL), REPLACE GUTTERS & DOWNSPOUTS, NON
ONFORMING PORCH REMOVED' DREXLER ELECTRIC TO DO ELECTRiCAL WORK
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$4,800.00 Plan Approval
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Issued By:
/?? ú¿;
Date 05/19/2006
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld 111518120000
In the perfonnance of this work I agree to perform ali work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which itis not a party, If you perfonn the work
described In this permit applicaüon within an easement, the City strongly urges the permit applicant to contact the easement
hoider(s} and t ec ny ec ssary approvais be re starting such activity.
Signature
Date
~ I /9/Zotl G
Address 2347 ASHLAND ST
AgenUOwner
Oshkosh
WI 54901 - 0000
Telephone Number t:)¿P-2.3Ç"-O2/i]
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.