Loading...
HomeMy WebLinkAbout0119606-Plumbing (water heater) ~ OSHKOSH ON THE WATER Job Address 533-535 CAMELOT CT CITY OF OSHKOSH No 119606 PLUMBING PERMIT - APPLICATION AND RECORD OWner WISCONSIN HOUSING PRESERVATION CORF Create Date 05/19/2006 Contractor JOHN D RANSOM Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Shower Floor Drain Category 410 - Residential-Interior Plan WaterSoftner Wai!.S!. Shamp Sink ~ Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap ~ Bidet Sculry Sink Wash Ftn RPZValve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters DipWeli F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Lndry Tray Disposal Dishwasher Sump Pump 1 Classrm Sink Breakrm Sink Ejector/Grind REPLACE GAS WATER HEATER UNIT 533 "KITZ & PFEIL DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1221560000 $410.00 $0.00 $20.00 D Permit Voided I Plan Approval Permit Fees Date 05/19/2006 In the performance of this work, I a9ree to perform all work pursuant to rules 90vernin9 the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City stron91y urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before startin9 such activity. Signature Address W5056 PARADISE LN Date Agent/Owner FOND DU LAC WI 54935 - 0000 Telephone Number 920-922-1987 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.