HomeMy WebLinkAbout0119582-Building
e
OSHKOSH
ON THE WATER
Job Address 1304 TAFT AVE
CITY OF OSHKOSH
No
119582
BUILDING PERMIT - APPLICATION AND RECORD
OWner VERONICA SCHROEDER
Create Date
05/1812006
Designer
Contractor
PACKER VALLEY BUILDERS, INC
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
_Sq.Ft.
_Sq.Ft.
Rooms
Height
Ft.
0 Projection I
Canopies
Finished/Living
Bedrooms
Stories
Garage
_Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature SFRI Bathroom and Kitchen remodel/ Replacing cabinets and countertops, Installing a door at the rear of the house and providing a code
of Work om plaint exit. cutting down a 213 height wall in the kitchen to 42" to serve as a countertop, flooring and wall finish
HVAC Contractor
Plumbing Contractor
Electric Contractor
$15,000.00 Plan Approval
$0.00 Permit Fee Paid
$99.00 Park Dedication
Fees: Valuation
$0.00
Issued By:
~
Date 05/18/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1604300000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
:~~~~::::ndm:~lngSUChactlvlty. Date ,)(Sé-/g'r¿9é
AgenVOwner
Address 2277 CLAIRVILLE ROAD
OSHKOSH
WI 54904 - 0000
Telephone Number
920-232-7620
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.