Loading...
HomeMy WebLinkAbout2006-Building (roof) e OSHKOSH ON THE WATER Job Address 1119 S MAIN ST CITY OF OSHKOSH No 119581 BUILDING PERMIT. APPLICATION AND RECORD Owner GERALD F HENDRICKSON Create Date 05/18/2006 Designer Contractor PACKER VALLEY BUILDERS, INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement - Sq, Ft. Rooms Height Finished/Living - Sq, Ft. Bedrooms Stories Garage - Sq, Ft, Baths Ft. 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature' est Exterior remodeling' Replacing damaged roofing on the house, remove and replace the roof on the garage replace railings at the of Work ront and rear doors, replace a front window and a storm door. HVAC Contractor Plumbing Contractor Electric Contractor $5,900.00 Plan Approval $0.00 Permit Fee Paid $50,00 Park Dedication $0.00 Fees: Valuation Issued By: '3fj Date 05/18/2006 Final/O,P, 00/00/0000 0 Permit Voided I Parcelld # 0303220000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement :~:~:::~nd~ starting such acti,^ty, Date >< ~/:ir~a Agent/Owner Address 2277 CLAIRVILLE ROAD OSHKOSH WI 54904 - 0000 Telephone Number 920-232-7620 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.