HomeMy WebLinkAbout2006-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 1119 S MAIN ST
CITY OF OSHKOSH
No
119581
BUILDING PERMIT. APPLICATION AND RECORD
Owner GERALD F HENDRICKSON
Create Date
05/18/2006
Designer
Contractor
PACKER VALLEY BUILDERS, INC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement - Sq, Ft. Rooms Height
Finished/Living - Sq, Ft. Bedrooms Stories
Garage - Sq, Ft, Baths
Ft.
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature' est Exterior remodeling' Replacing damaged roofing on the house, remove and replace the roof on the garage replace railings at the
of Work ront and rear doors, replace a front window and a storm door.
HVAC Contractor
Plumbing Contractor
Electric Contractor
$5,900.00 Plan Approval
$0.00 Permit Fee Paid
$50,00 Park Dedication
$0.00
Fees: Valuation
Issued By:
'3fj
Date 05/18/2006
Final/O,P, 00/00/0000
0 Permit Voided I
Parcelld # 0303220000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
:~:~:::~nd~ starting such acti,^ty, Date >< ~/:ir~a
Agent/Owner
Address 2277 CLAIRVILLE ROAD
OSHKOSH
WI 54904 - 0000
Telephone Number
920-232-7620
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.