HomeMy WebLinkAbout0119597-Plumbing (water softener)
e
OSHKOSH
ON THE WATER
Job Address 1000-1006 GREENWOOD CT
Contractor DIAMOND WATER CONDITIONING
CITY OF OSHKOSH
No
119597
PLUMBING PERMIT - APPLICATION AND RECORD
Owner OSHKOSH HOUSING AUTHORITY
Create Date 05/18/2006
Cate90ry 410 - Residential-Interior
Plan
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Water Softner
Local Waste
Clothes Wshr
1 Wait.St. Shamp Sink - Coffee Maker
Ice Chest FlrlWst Sink Int Grease Trap
Exam Sink Catch Basin Ext Grease Trap -
Sculry Sink Wash Ftn RPZValve
Hand Sink Urinal Eye Wash Statn
Plaster Sink Standp Rec Wtr Sewer Mtrs
Surgeons Sink Ice Maker Deduct Meters
F Prep Sink Gar Drain Wtr Usage Mtrs
Serv Sink Soda Disp
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
1000 GREENWOOD CT /INSTALL NEW CARBON FILTER AND WATER SOFTENER "DEBIT ACCT
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1522910000
Use/Nature
of Work
Valuation
Issued By
$1.624.00
Plan Approval
$0.00
$20.00 0 Permit Voided I
Permit Fees
Date 05/18/2006
In the performance of this work, I agree to perform all work pursuant to rules govemlng the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work
described In this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address POBOX 170
Agent/Owner
GREENVILLE
WI 54942 - 0000
Telephone Number
920-757-5440
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e, Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.