Loading...
HomeMy WebLinkAbout0119597-Plumbing (water softener) e OSHKOSH ON THE WATER Job Address 1000-1006 GREENWOOD CT Contractor DIAMOND WATER CONDITIONING CITY OF OSHKOSH No 119597 PLUMBING PERMIT - APPLICATION AND RECORD Owner OSHKOSH HOUSING AUTHORITY Create Date 05/18/2006 Cate90ry 410 - Residential-Interior Plan Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr 1 Wait.St. Shamp Sink - Coffee Maker Ice Chest FlrlWst Sink Int Grease Trap Exam Sink Catch Basin Ext Grease Trap - Sculry Sink Wash Ftn RPZValve Hand Sink Urinal Eye Wash Statn Plaster Sink Standp Rec Wtr Sewer Mtrs Surgeons Sink Ice Maker Deduct Meters F Prep Sink Gar Drain Wtr Usage Mtrs Serv Sink Soda Disp Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn 1000 GREENWOOD CT /INSTALL NEW CARBON FILTER AND WATER SOFTENER "DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1522910000 Use/Nature of Work Valuation Issued By $1.624.00 Plan Approval $0.00 $20.00 0 Permit Voided I Permit Fees Date 05/18/2006 In the performance of this work, I agree to perform all work pursuant to rules govemlng the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address POBOX 170 Agent/Owner GREENVILLE WI 54942 - 0000 Telephone Number 920-757-5440 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e, Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.