HomeMy WebLinkAbout0119594-Building
e
OSHKOSH
ON THE WATER
Job Address 3131 ELK RIDGE DR
CITY OF OSHKOSH
No
119594
BUILDING PERMIT - APPLICATION AND RECORD
Owner MIDWEST GENERAL CONTRACTORS
Create Date
05/18/2006
Designer
Contractor
MIDWEST GENERAL CONTRACTORS INC
Category
130 - New Multi-Family
Plan T2-43-0506
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
_Sq.Ft.
_Sq.Ft.
Rooms
Height
Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
_Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier 0 Other
0 Treated Wood"
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Park Dedication
Required
# Dwelling Units ~
# Structures
Use/Nature f.'OMM/8-unit Muitifamily 'State Trans 10 #1266970
of Work
HVAC Contractor
BREWER HEATING
Plumbing Contractor
WATTERS PLUMBiNG
Electric Contractor
CUMINGS ELECTRIC INC
Fees: Valuation $362.000.00 Plan Approval
Issued By: ~\)vI
$0.00 Permit Fee Paid
$1.240.00 Park Dedication
$2.640.00
Date 05/18/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld #
In the performance of this work I agree to perform all work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any ne sary p~va;s before starting such activity. r- - f eo_o.l'
Signature 'Y Date.J II .
AgenUOWner
Address 100 N WESTHAVEN DR
OSHKOSH
WI 54904 - 0000 Telephone Number
421>-2008
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.