Loading...
HomeMy WebLinkAbout2006-Building (roof) ~ OSHKOSH ON THE WATER Job Address 706 REICHOW ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 119566 Owner MARJORIE L HYMER Create Date 05/17/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement - Sq. Ft. Rooms Height Finished/Living - Sq. Ft. Bedrooms Stories Garage - Sq. Ft. Baths Ft. 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Penmit Flood Plain Height Penmit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature SFR / TEAR OFF AND REPLACE EXISTING ROOFING ON HOUSE AND GARAGE' NO STRUCTURAL CHANGES of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: /}?bD Date 05/17/2006 Final/O.P. 00/00/0000 0 PenmitVoided I Parcelld # 0610720000 In the performance of this work I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature fill ~ f{r~ Agent/Owner Date S-j7-6c, Address 706 REICHOW ST OSHKOSH WI 54902 - 5534 Tetephone Number q '2.-" - ""1.-3;3 - '16(" '7 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Penmit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.