HomeMy WebLinkAbout0119571-Building (closet)
f)
OSHKOSH
ON THE WATER
Job Address 1815 ORCHARD LN
CITY OF OSHKOSH
BUILDING PERMIT. APPLICATION AND RECORD
No
119571
Owner GARY UMARY B KOELBL
Create Date
05/17/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Buiiding
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~ Sq. Ft. Rooms Height
Finished/Living ~ Sq. Ft. Bedrooms Stories
Garage ~ Sq. Ft. Baths
Ft.
D Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature 'SFRI Adding a 2' x 4' closet' in the area between the front foyer and living room.
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$500.00 Plan Approval -
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Date 05/17/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld #1310570000
In the performance of this work I agree to perfonm all work pursuant to ruies governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
hoider(s) and to any necessary appn;v~, al efore trtj'? such activity. Date ~ ,; II 7' ¡.' /1 /.'
Signature . 4?' ~'. - KfOt ~ ,~'--' i.!. - f./ b
Agent/Owner / (
OSHKOSH
WI 54902 - 6664
Telephone Number
233-8735
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.