HomeMy WebLinkAbout0119577 B
~
OSHKOSH
ON THE WATER
Job Address 3021 N MAIN ST
CITY OF OSHKOSH
No
119577
BUILDING PERMIT - APPLICATION AND RECORD
Owner JACK E/LiNDA S CARSTENS
Create Date
05/15/2006
Designer
Contractor
ORDE ADVERTISING INC.
Category
254 - Signs
Plan
Type
0 Building
. Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement - Sq. Ft. Rooms Height
Finished/Living - Sq. Ft. Bedrooms Stories
Garage - Sq. Ft. Baths
Ft.
0 Projection I
Canopies
Signs
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
monument style
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units ~
# Structures
~
Park Dedication
Use/Nature OfficeiWarehouse - Replace cabinet to existing monument sign, 37.5" x 82" internally illuminated, same size as wind damaged sign.
ofWork
Plumbing Contractor
HVAC Contractor
Electric Contra
$2, 00.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Fees: Valuatio
Issued By:
Date 05/17/2006
Final/O,P, 00/00/0000
0 Permit Voided I
Parcelld # 1519601701
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holderls) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 1825 NIMITZ RD
AgenUOwner
DEPERE
WI 54115 - 0000
Telephone Number
920-339-4600
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i,e, Footing, Service, Final, etc,), Access into Building if Secure (how do we gain entry), your Name and Phone
Number, Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.