Loading...
HomeMy WebLinkAbout0119565-Building e OSHKOSH ON THE WATER Job Address 2745 E HAVENWOOD DR CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 119565 Owner SUSAN J SLEEZER Create Date 05/11/2006 Desi9ner Contractor GERALD L PETERSON Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement - Sq. Ft. Rooms Height Finished/Living - Sq. Ft. Bedrooms Stories Garage - Sq.Ft. Baths Ft. D Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units 0 # Structures ---2 Park Dedication Use/Nature SFRI Remodeling the basement to include a bathroom, family room, and bar area. of Work HVAC Contractor UNKNOWN??? Electric Contractor UNKNOWN???? Fees: Valuation $13,600.00 Plan Approval Plumbing Contractor PLUFF PLUMBING $0.00 Permit Fee Paid $94,00 Park Dedication $0.00 Issued By: //} ~ \:J Date 05/17/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1632023900 In the performance of this work I agree to perform ali work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to sepu e any necessary :¡pp efore starting such activity. L Date 7 c-J7riC~ Signature Address W6334 RAVINE CT Agent/Owner MENASHA WI 54952 - 0000 Telephone Number 7 '¡j-;i9£-~ To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.