Loading...
HomeMy WebLinkAbout2006-Building (roof) 0 OSHKOSH ON THE WATER Job Address 177 N WASHBURN ST CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD No 119530 Owner MILLS PROPERTIES INC Create Date 05/05/2006 Designer Wldseth Smith Nolting Contractor UNLICENSED-UNKNOWN Category 232 - Alteration Stores & Customer Service Plan T2-40-0506 Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage ~Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Park Dedication Not Required Flood Plain ~ # Dwelling Units -----2 Height Permit Not Required # Structures 0 Use/Nature tore/Installation of fully adhered EPDM roofing system as per plans over 49.200 sq It of standing seem roof. . Permit issued to owner. of Work Buysse Roofing is the contractor doing work. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $200.000.00 Plan Approval $0.00 Permit Fee Paid $664.00 Park Dedication $0.00 Issued By: Date 05/16/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0614000000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any nece approvals before starting such activity. ~:llf Fk.. r Date 5-1(",o~ Signature Address PO BOX 971 Agent/Owner BRAINERD MN 56401 - 0000 TelephoneNumber '2:20-2 >/.~7J! To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.