Job Address 177 N WASHBURN ST
CITY OF OSHKOSH
BUILDING PERMIT -APPLICATION AND RECORD
No
119530
Owner MILLS PROPERTIES INC
Create Date
05/05/2006
Designer
Wldseth Smith Nolting
Contractor
UNLICENSED-UNKNOWN
Category
232 - Alteration Stores & Customer Service
Plan T2-40-0506
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
~Sq.Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Park Dedication
Not Required
Flood Plain ~
# Dwelling Units -----2
Height Permit Not Required
# Structures
0
Use/Nature tore/Installation of fully adhered EPDM roofing system as per plans over 49.200 sq It of standing seem roof. . Permit issued to owner.
of Work Buysse Roofing is the contractor doing work.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$200.000.00 Plan Approval
$0.00 Permit Fee Paid
$664.00 Park Dedication
$0.00
Issued By:
Date 05/16/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0614000000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any nece approvals before starting such activity.
~:llf Fk.. r
Date
5-1(",o~
Signature
Address PO BOX 971
Agent/Owner
BRAINERD
MN 56401 - 0000
TelephoneNumber '2:20-2 >/.~7J!
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.