Loading...
HomeMy WebLinkAbout0119537-Building "e OSHKOSH ON THE WATER Job Address 80 STONEY BEACH RD CITY OF OSHKOSH No 119537 BUILDING PERMIT - APPLICATION AND RECORD Owner BRiAN/ELEANOR TEVIOTDALE Create Date 05/16/2006 Designer Contractor OWNER Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement - Sq. Ft. Rooms Height Finished/Living - Sq. Ft. Bedrooms Stories Garage - Sq. Ft. Baths Ft. 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Penn it Not Required Flood Plain Height Penn it Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature SFRI Finishing the attic area to provide for a train room. "Fox Cities Construction instailed a new floor system. Windows wiil be instailed of Work a provide the required 8% light. The room wiil be heated- a seperate permit wiil be required to be obtained. HVAC Contractor UNKNOWN??? Plumbing Contractor Electric Contractor UNKNOWN???? Fees: valua Issued By: jl\. $5.900.00 Plan Approval $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Date 05/16/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1414700300 in the perfonnance of this work I agree to perfonn ail work pursuant to ooies governing the described constooction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work described in this permit ap Ilea' n within an easement, the City strongly urges the pennit applicant to contact the easement holder(s) and to secure n cessary approvals b fore starting such activity. ~ ! Signature Date cp f~/Ob. Agent/Owner OSHKOSH WI 54902 - 7241 Telephone Number Z->Z -OriJ7. To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i,e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready, r; c; ---- t¡.,:2 ?' fN,'~ 4-'1'2: ( ~ ,¡. ,¡) ;:¡ <t :;¡; .í ç ~ ""I:s ~ [... ~ ,r't "" Ð /\ ,J i.." ~ 4 ~ ~~ ¡J :3, "'"" j ,:l 'fJ ...""""; \" ì';, ~! "" r< ., U " - ~2! i!11 (}; \,¡ '1. :Q fl' d>.~ ~ ~ k r: ¿- , of ~ ,'-> j:. \ ~ }.; ;. Ç;¡I/) "'>