Loading...
HomeMy WebLinkAboutPlumbing Plan Approval (2) MAY 11 2006 Safety and Buildings 141 NW BARSTOW ST FL4TH WAUKESHA WI 53188-3789 TOO #: (608) 264-8777 www.commerce.wi.gov/sb/ www.wisconsin.gov n ~j, commerce.wLgoy Wi!~9JJ!IQ May 09, 2006 D¿rltkli,'itid Ür COMMUNiTY DEVEWPM£tn Jim Doyle, Governor Mary P. Burke, Secretary CUST ill No. 916133 DA VlD ODEGARD AFFILIATED ENGINEERS INC 5802 RESEARCH PARK BLVD PO BOX 44991 MADISON WI 53719 ATTN: Plumbing Inspector MUNICIPAL CLERK CITY OF OSHKOSH PO BOX 1130 OSHKOSH WI 54903-1130 CONDITIONAL APPROVAL PLAN APPROVAL EXPIRES: 05/09/2008 SITE: Mercy Medical Center 500 S Oakwood Dr City of Oshkosh, 54904-7944 FOR: Facility: 664839 CANCER CENTER ADDITION AND REMODEL 500 S OAKWOOD DR OSHKOSH 54904 ObjectType: Plumbing System, Building Specific Regulated Object ill No.: 1022514 Revision; Plan Type: Addition-Alteration; 32 Interior Fixture(s) Object Type: Interior Sanitary Drain & Vent System Regulated Object lD No.: 1023707 Revision Object Type: Interior Water Distribution System Regulated Object ill No.: 1023708 Revision .. Object Type: Plumbing System, Site Specific Regulated Object lD No.: 1023709 Revision Object Type: Interior Storm Drain System Regulated Object ill No.: 1023712 Revision The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements. No person may engage in or work at plumbing in the state unless licensed to do so by the Department per s.145.06, stats. The following conditions shall be met during construction or installation and prior to occupancy or use: Key Items 1. Comm Table 82.20-2 Line 5. Submittal does not include approval for reduced pressnre backflow preventer. Submittal and Approval required prior to installation. 2. Comm 82.41(3)(a)1. Potable water supply systems shall be protected against contamination due to cross connections or backflow conditions by one of the methods or devices specified in Table 82.41-1 or 82.41-2. Cross connection control devices shall be provide at the supply to each piece of equipment. OAVID ODEGARD Page 2 5/9/2006 A copy of the approved plans, specifications and this letter shall be on-site during construction and open to inspection by authorized representatives of the Department, which may include local inspectors. All permits required by the state or the local municipality shall be obtained prior to commencement of construe ti 0 nI ins talla ~ 0 nI opera ti 0 n. In granting this approval the Division of Safety & Buildings reserves the right to require changes or additions should conditions arise making them necessary for code compliance. As peIState stats 101.12(2), nothing in this review shall relieve the designer of the responsibility for designing a safe building, structure, or component. Inquiries concerning this correspondence may be made to me at the telephone number listed below, or at the address on this letterhead. 7JiJWnf?P/ Chet Kmtop General Plumbing Plan Reviewer, Integrated Services (262) 548-8634, Fax: (262) 548-8614 ,Monday - Friday 07:30 To 4:00 chet.kintop@wisconsin.gov Fee Required $ Fee Received $ Balance Due $ 75.00 75.00 0.00 cc: James E Zickert, Plumbing Consultant, (920) 948-7336 Cherie Claussen, Hammel Green & Abrahamson Architects & Engineers (Plans Mailed To) Gary Kusnierz, Affmity Health Systems Wisconsin Building Safety Week is May 7-13, 2006. Codes, Design, Plan Review, Permits, Construction, Installation, Inspections - All part of protecting the health and safety of people in Wisconsin - All part of supporting the quality of communities and the value of properties - http://commerce.wi.gov/SB/SB-Div BuildingSafetyWeek2006.html