Loading...
HomeMy WebLinkAbout0119542 P e OSHKOSH ON THE WATER Job Address 201 LAKE POINTE DR CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Contractor CULLIGAN WATER CONDITIONING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Shower Water softner Floor Drain Local Waste Lndry Tray Clothes Wshr Disposal Bidet Dishwasher Beer Tap Sump Pump Lab Sink Classrm Sink Sterilizer Breakrm Sink Dip Well Ejector/Grind Drink Ftn Owner JUNE LEE POAD Category 410 - Residential-Interior 1 Wail.sl. Ice Chest Exam Sink sculry Sink Hand Sink Shamp Sink - FlrlWst Sink Catch Basin Wash Ftn Urinal standp Rec Ice Maker No 119542 Plaster Sink Surgeons Sink F Prep Sink serv Sink Gar Drain Soda Disp Create Date 05/16/2006 Plan Coffee Maker Int Grease Trap Ext Grease Trap - RPZValve Eye Wash statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Use/Nature INSTALL WATER SOFTENER "DEBIT ACCT of Work Valuation Size Sanitary Sewer Storm Sewer Water Service Material Type # Conn. Type $350.00 $0.00 Parcelld # 0614407505 Plan Approval Issued By Permit Fees $20.00 0 Permit Voided I Date 05/16/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 405 PROSPECT AVE Agent/Owner N FOND DU LAC WI 54937 - 1498 Telephone Number 235-1490 OR 233-05 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.