Loading...
HomeMy WebLinkAbout0119543-Plumbing (fixtures) e OSHKOSH ON THE WATER Job Address 739 W 19TH AVE Contractor MOREMAN PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 119543 Owner MICHAEL K MCMAHON Create Date 0511612006 Cate90ry 410 - Residential-Interior Plan Water Softner Wait. 51. Shamp Sink - Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ex! Grease Trap - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Slatn Lab Sink Plaster Sink Slandp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures '--I of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink EjectorlGrind Valuation Issued By Size Material Type # Conn. Type Sanitary Sewer Address PO BOX 1325 Storm Sewer Water Service Parcelld # 1408600000 $1,500.00 1)1 L.() $0.00 $21.00 0 Permit Voided I Plan Approval Date 0511612006 Permit Fees In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party; if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner OSHKOSH WI 54903 - 0000 Telephone Number 231-9191 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.