Loading...
HomeMy WebLinkAbout0119525-Building (siding) ~ OSHKOSH ON THE WATER Job Address 947 W 11TH AVE CITY OF OSHKOSH No 119525 BUILDING PERMIT. APPLICATION AND RECORD OWner LORRAINE M SPANBAUER Create Date 05/16/2006 Designer Contractor LUECKS HOME IMPROVEMENT INC Category 141 - Exterior Remodeling Plan Type . Building a Sign a Canopy a Fence a Raze Zoning Class of Const: Size Unfinished/Basement _Sq. Ft. _Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage - Sq. Ft. Baths Signs Foundation . Poured Concrete a Floating Slab a Concrete Block a Post a Pier a Treated Wood a Other Occupancy Permit Not Required Park Dedication Not Required Flood Plain ~ # Dwelling Units ----.!> Height Permit Not Required # Structures ----.!> Use/Nature ofWork FRI Replaceing steel siding with steel siding. on house and garage - No EIV provided NA - j-blocks previously installed HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $12,000.00 Plan Approval $0.00 Permit Fee Paid $84.00 Park Dedication $0.00 Issued By: Date 05/16/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1305760000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 706 S MAIN STREET AgenUOwner OSHKOSH WI 54902 - 6084 Telephone Number 235-0106 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.