HomeMy WebLinkAbout0119525-Building (siding)
~
OSHKOSH
ON THE WATER
Job Address 947 W 11TH AVE
CITY OF OSHKOSH
No
119525
BUILDING PERMIT. APPLICATION AND RECORD
OWner LORRAINE M SPANBAUER
Create Date
05/16/2006
Designer
Contractor
LUECKS HOME IMPROVEMENT INC
Category
141 - Exterior Remodeling
Plan
Type
. Building
a Sign
a Canopy
a Fence
a Raze
Zoning
Class of Const:
Size
Unfinished/Basement
_Sq. Ft.
_Sq.Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
- Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete a Floating Slab
a Concrete Block a Post
a Pier
a Treated Wood
a Other
Occupancy Permit Not Required
Park Dedication
Not Required
Flood Plain ~
# Dwelling Units ----.!>
Height Permit Not Required
# Structures
----.!>
Use/Nature
ofWork
FRI Replaceing steel siding with steel siding. on house and garage - No EIV provided NA - j-blocks previously installed
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$12,000.00 Plan Approval
$0.00 Permit Fee Paid
$84.00 Park Dedication
$0.00
Issued By:
Date 05/16/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1305760000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 706 S MAIN STREET
AgenUOwner
OSHKOSH
WI 54902 - 6084
Telephone Number
235-0106
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.