Loading...
HomeMy WebLinkAbout0119506 P e OSHKOSH ON THE WATER Job Address 24002410 WISCONSIN ST Contractor O'NEILL ENTERPRISE INC CITY OF OSHKOSH No 119506 Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature ofWork Valuation Issued By PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Sanitary Sewer Storm Sewer Water Service Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn OWner WILLIAM TRICKEL Create Date 05/15/2006 Category 401 - Residential-Exterior (laterals) Plan Wait.St. Shamp Sink - Coffee Maker Ice Chest Flr/Wst Sink Int Grease Trap Exam Sink Catch Basin Ext Grease Trap - Sculry Sink Wash Ftn RPZValve Hand Sink Urinal Eye Wash Statn Plaster Sink Standp Rec Wtr Sewer Mtrs Surgeons Sink Ice Maker Deduct Meters F Prep Sink Gar Drain Wtr Usage Mtrs Serv Sink Soda Disp 4" 1-1/2" $0.00 Type Lateral # Conn. Type New r'IT' ~"AA' AA"ro~ ~,,~ ~,~ '"~ Size Material 4" Plastic Plastic Lateral New Plastic Lateral New Parcelld # 1219740102 $5,000.00 Plan Approval Permit Fees $150.00 D Permit Voided I Date 05/15/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 522 W 6TH AVE Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 920-230-2007 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Penmit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.