HomeMy WebLinkAbout0119522 P
e CITY OF OSHKOSH No 119522
OSHKOSH PLUMBING PERMIT. APPLICATION AND RECORD
ON THE WATER
Job Address 1836 OHIO ST Owner ROBERT J BAUERNFEIND Create Date 05/15/2006
Contractor JOHN D RANSOM Category 411 - Residential-Water Heaters Plan
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Shower
Floor Drain
Water Softner
Local Waste
Clothes Wshr
Wail.SI.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Lndry Tray
Disposal
Dishwasher
Sump Pump
1 Classrm Sink
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Breakrm Sink
Ejector/Grind
Shamp Sink ~
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Coffee Maker
Int Grease Trap
Ext Grease Trap ~
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Use/Nature REPLACE GAS WATER HEATER "KITZ & PFEIL ACCT
of Work
Valuation
Issued By
Size
Material
Type
#
Sanitary Sewer
Storm Sewer
Water Service
Conn. Type
Parcelld #
1407570000
$401.00
$0.00
Permit Fees
$20.00 0 Permit Voided I
Plan Approval
AgenUOwner
FOND DU LAC
Address W5056 PARADISE LN
Wi 54935 - 0000
Date 05/15/2006
In the performance of this work, I agree to perform ali work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit appiicant to contact the
easement holder(s) and to secure any necessary approvais before starting such activity.
Signature
Date
Telephone Number 920-922-1987
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.