Loading...
HomeMy WebLinkAbout2006-Plumbing (RP valve) e OSHKOSH ON THE WATER Job Address 1404 S MAIN ST CITY OF OSHKOSH No 119503 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain lndry Tray Disposal Dishwasher Sump Pump Classrm Sink OWner COCA COLA BOTTLING Create Date 05/15/2006 Cate90ry 440 - Industrial-Interior Plan Water Softner Wait. 51. Shamp Sink Coffee Maker - local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor AG MECHANICAL Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Breakrm Sink Ejector/Grind 1 1-1/4" RP VALVE Use/Nature ,INSTALL RP VALVE TO SERVE BOilER IN WAREHOUSE "CHECK #3506 of Work Valuation Issued By Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0304740000 $6,000.00 $0.00 $20.00 D Permit Voided I Plan Approval Permit Fees Date 05/15/2006 in the performance of this work, I agree to perform all work pursuant to nuies governing the described constnuction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement hoider(s} and to secure any necessary approvals before starting such activity. Signature Address 1939 CTY RD GG Date Agent/OWner NEENAH WI 54956 - 0000 Telephone Number 920-751-0864 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.