HomeMy WebLinkAbout0119514-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 1830 HAZEL ST
CITY OF OSHKOSH
No
119514
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor ZELINSKI PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater 1
Site Drain
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Roof Drain
Misc.
Fixtures
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Use/Nature
ofWork
rrn'~~~_"-
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Owner AMY C ANDERSEN
Create Date 05/15/2006
Category 411 - Residential-Water Heaters
Plan
Wail.SI. Shamp Sink - Coffee Maker
Ice Chest FlrlWst Sink Int Grease Trap
Exam Sink Catch Basin Ext Grease Trap -
Sculry Sink Wash Ftn RPZ Valve
Hand Sink Urinal Eye Wash Statn
Plaster Sink Standp Rec Wtr Sewer Mtrs
Surgeons Sink Ice Maker Deduct Meters
F Prep Sink Gar Drain Wtr Usage Mtrs
Serv Sink Soda Disp
Sanitary Sewer
Type
Storm Sewer
Water Service
Size
Material
#. Conn. Type
Parcelld #
1514817000
Valuation
$500.00
Plan Approval
Issued By
$0.00
Permit Fees
$20.00 0 Permit Voided I
Date 05/15/2006
In the performance of this work, i agree to perfomn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this pemnit application within an easement, the City strongly urges the permit applicant to contact the
easement hol nd to secu an e sary ap r vals before starting such activity. -f., ~ /
Sipnature Date s-¡ / 0/ ¿Jr;
Address 1026 BRIGHTON DR
MEN~A__._- "^"'- 54952 - 0000 Telephone Number
729-9295
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not peñormed within two business days from the time the project is ready.