Loading...
HomeMy WebLinkAbout0119498-Plumbing ~ OSHKOSH ON THE WATER Job Address 3110BAILEYCT CITY OF OSHKOSH No 119498 PLUMBING PERMIT -APPLICATION AND RECORD Owner RUSCH HOMES LLC Create Date 05/05/2006 Category 410- Residential-Interior Plan 1 Water Softner WaitSt Shamp Sink ~ Coffee Maker 1 Local Waste Ice Chest FlrlWstSink Int Grease Trap Clothes Wshr 1 Exam Sink Catch Basin Ext Grease Trap ~ 1 Bidet Sculry Sink Wash Ftn RPZ Valve 1 BeerTap Hand Sink Urinal Eye Wash Statn 1 Lab Sink Plaster Sink Standp Rec 2 Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor SBS PLUMBiNG LLC Bathtub 1 Shower Whirlpool 1 Floor Drain Lavatory 3 Lndry Tray Toilet 3 Disposal Res. Sink 1 Dishwasher Bar Sink Sump Pump Water Heater 1 Classrm Sink Site Drain Breakrm Sink Roof Drain Ejector/Grind Misc. 2 HOSE BIBB Fixtures Use/Nature of Work NSFR/ New single family quad level 3 car attached garage and a 14' x 14' patio. GAS WATER HEATER."DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1342951000 $7,800.00 Plan Approval $0.00 Permit Fees $140.00 0 Permit Voided I Valuation Issued By Date 05/15/2006 in the perfonnance of this work, I agree to perfonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this pennit application within an easement, the City strongiy urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 3904 AgenUOwner OSHKOSH WI 54903 - 3904 Telephone Number 920-410-5933 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.