HomeMy WebLinkAbout0119498-Plumbing
~
OSHKOSH
ON THE WATER
Job Address 3110BAILEYCT
CITY OF OSHKOSH
No
119498
PLUMBING PERMIT -APPLICATION AND RECORD
Owner RUSCH HOMES LLC Create Date 05/05/2006
Category 410- Residential-Interior Plan
1 Water Softner WaitSt Shamp Sink ~ Coffee Maker
1 Local Waste Ice Chest FlrlWstSink Int Grease Trap
Clothes Wshr 1 Exam Sink Catch Basin Ext Grease Trap
~
1 Bidet Sculry Sink Wash Ftn RPZ Valve
1 BeerTap Hand Sink Urinal Eye Wash Statn
1 Lab Sink Plaster Sink Standp Rec 2 Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
Contractor SBS PLUMBiNG LLC
Bathtub 1 Shower
Whirlpool 1 Floor Drain
Lavatory 3 Lndry Tray
Toilet 3 Disposal
Res. Sink 1 Dishwasher
Bar Sink Sump Pump
Water Heater 1 Classrm Sink
Site Drain Breakrm Sink
Roof Drain Ejector/Grind
Misc. 2 HOSE BIBB
Fixtures
Use/Nature
of Work
NSFR/ New single family quad level 3 car attached garage and a 14' x 14' patio. GAS WATER HEATER."DEBIT ACCT
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1342951000
$7,800.00
Plan Approval
$0.00
Permit Fees
$140.00 0 Permit Voided I
Valuation
Issued By
Date 05/15/2006
in the perfonnance of this work, I agree to perfonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this pennit application within an easement, the City strongiy urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 3904
AgenUOwner
OSHKOSH
WI 54903 - 3904
Telephone Number 920-410-5933
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.