Loading...
HomeMy WebLinkAbout0119521-Plumbing (pedicure chair) e OSHKOSH ON THE WATER Job Address 2010-2100 W 9TH AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 119521 Contractor M P KELLY Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature ofWork Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 1 PEDICURE CHAIR Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Owner TOWER ASSOCIATES LLC Create Date 05/15/2006 Plan Category 440 - Industrial-Interior WaitSt. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink ~ FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Coffee Maker Int Grease Trap Ext Grease Trap ~ RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Soda Disp CONNECT NEW PEDICURE CHAIR AT 2060 W 9TH AVE REFLECTIONS SALON "CHECK #7792 / Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0614660000 Valuation Issued By $800.00 Plan Approval $0.00 PermitFees $20.00 D Permit Voided I Date 05/15/2006 In the performance of this work. I agree to perfonn all work pursuant to rules governin9 the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work described in this pennit application within an easement, the City stron91y urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before startin9 such activity. Signature Date Telephone Number 231-1750 Address 665 N MAIN ST Agent/Owner OSHKOSH WI 54901 - 4431 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.