HomeMy WebLinkAbout0119521-Plumbing (pedicure chair)
e
OSHKOSH
ON THE WATER
Job Address 2010-2100 W 9TH AVE
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
119521
Contractor M P KELLY
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
ofWork
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
1 PEDICURE CHAIR
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Owner TOWER ASSOCIATES LLC
Create Date 05/15/2006
Plan
Category 440 - Industrial-Interior
WaitSt.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Shamp Sink ~
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Coffee Maker
Int Grease Trap
Ext Grease Trap ~
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Soda Disp
CONNECT NEW PEDICURE CHAIR AT 2060 W 9TH AVE REFLECTIONS SALON "CHECK #7792
/
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
0614660000
Valuation
Issued By
$800.00
Plan Approval
$0.00
PermitFees
$20.00 D Permit Voided I
Date 05/15/2006
In the performance of this work. I agree to perfonn all work pursuant to rules governin9 the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work
described in this pennit application within an easement, the City stron91y urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before startin9 such activity.
Signature
Date
Telephone Number 231-1750
Address 665 N MAIN ST
Agent/Owner
OSHKOSH
WI 54901 - 4431
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.