HomeMy WebLinkAbout0119483-Plumbing (toilet)
e
OSHKOSH
ON THE WATER
Job Address 831 WINNEBAGO AVE
CITY OF OSHKOSH
No
119483
PLUMBING PERMIT - APPLICATION AND RECORD
Owner NICHOLAS J SKOGLIND/NICOLE E DITTMER Create Date 05/11/2006
Contractor M P KELLY
[-'--.~~
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
ofWork
Valuation
Issued By
Shower
Floor Drain
Lndry Tray
1 Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Category 410 - Residential-Interior
Plan
Water Softner Wait. St. Shamp Sink Coffee Maker
-
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin - Ext Grease Trap
-
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Wen F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
----
Address 665 N MAIN ST
Size
Material
Type
#
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
0202790100
$306.00
$0.00
$20.00 0 Pennit Voided I
Plan Approval
Permit Fees
Date 05/12/2006
In the perfonnanoe of this work, I agree to perfonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Date
Signature
Telephone Number 231-1750
AgenUOwner
OSHKOSH
WI 54901 -4431
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.