Loading...
HomeMy WebLinkAbout0119483-Plumbing (toilet) e OSHKOSH ON THE WATER Job Address 831 WINNEBAGO AVE CITY OF OSHKOSH No 119483 PLUMBING PERMIT - APPLICATION AND RECORD Owner NICHOLAS J SKOGLIND/NICOLE E DITTMER Create Date 05/11/2006 Contractor M P KELLY [-'--.~~ Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature ofWork Valuation Issued By Shower Floor Drain Lndry Tray 1 Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Category 410 - Residential-Interior Plan Water Softner Wait. St. Shamp Sink Coffee Maker - Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin - Ext Grease Trap - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Wen F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp ---- Address 665 N MAIN ST Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0202790100 $306.00 $0.00 $20.00 0 Pennit Voided I Plan Approval Permit Fees Date 05/12/2006 In the perfonnanoe of this work, I agree to perfonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Telephone Number 231-1750 AgenUOwner OSHKOSH WI 54901 -4431 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.