Loading...
HomeMy WebLinkAbout0119487-Plumbing (toilet) ~ OSHKOSH ON THE WATER Job Address 100 STONEY BEACH RD CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 119487 Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Shower Floor Drain Owner KENNETH M VISTE JR Create Date 05/11/2006 Category 410 - Residential-Interior Plan Water Softner Wai\.S\. Shamp Sink Coffee Maker ~ Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin -- Ext Grease Trap ~ Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage MtlS Drink Ftn Serv Sink Soda Disp Contractor M P KELLY Water Heater Site Drain Roof Drain Misc. Fixtures Lndry Tray 1 Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Use/Nature of Work rœ -"' -, -.~ ~ Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1414710000 Valuation $1,242.61 Plan Approval $0.00 Permit Fees $20.00 D Permit Voided I Issued By Date 05/12/2006 in the performance of this work. I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST Agent/Owner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.