HomeMy WebLinkAbout0119480 P
e
OSHKOSH
ON THE WATER
Job Address 2300 STATE ROAD 44
CITY OF OSHKOSH
No
119480
PLUMBING PERMIT - APPLICATION AND RECORD
Owner C E SA6
Contractor COATS, KEITH
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Create Date 05/12/2006
Category 430 - Industrial.Exterior (laterals)
Plan
Water Softner WaitSt
Local Waste Ice Chest
Clothes Wshr Exam Sink
Bidet Sculry Sink
Beer Tap Hand Sink
Lab Sink Plaster Sink
Sterilizer Surgeons Sink
Dip Well F Prep Sink
Drink Ftn Serv Sink
Shamp Sink -
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Coffee Maker
Int Grease Trap
1 Ext Grease Trap -
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Soda Disp
r~'=rn'~~'Œ ~"
Valuation
Issued By
Size
Material
Sanitary Sewer
Type
#
Storm Sewer
Water Service
Conn, Type
Parcelld #
1329000100
$3,000.00
$20.00 0 Permit Voided I
Plan Approval
$0.00
Permit Fees
Date 05/12/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges tI1e permit applicant to contact the
easement h~lder~ and to s u any ssary a provals before starting such activity.
Signature ~
Address 8424 SHIRLEY CT
AgenUOwner
WINNECONNE
WI 54986 - 9533
Date ç-~ ./.2 -""C::
Telephone Number 920-582-3975
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i,e, Footing, Service, Final, etc,), Access into Building if Secure (how do We gain entry), your Name and Phone
Number, Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.