HomeMy WebLinkAbout0119493-Plumbing
~
OSHKOSH
ON THE WATER
Job Address 10 W MURDOCK AVE
CITY OF OSHKOSH
No
119493
PLUMBING PERMIT -APPLICATION AND RECORD
OWner ASSOCIATED BANC CORP
Create Date 05/12/2006
Contractor 4 WAY CONSTRUCTION
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Category 430 - Industrial-Exterior (Iaterais)
Plan
Shower WaterSoftner Wai!.S!. Shamp Sink Coffee Maker
~
Floor Drain local Waste Ice Chest Flr/Wst Sink Int Grease Trap
lndry Tray Clothes Wshr Exam Sink Catch Basin Ex! Grease Trap
~
Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
Sump Pump lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature NEW WATER AND SANITARY LATERALS FOR ASS. BANK BUilDING. STORM WILL BE UNDER AN ADDITiONAL PERMIT.
of Work
Valuation
Issued By
Sanitary Sewer
Size
4"
# Conn. Type
1 New
Material
Plastic
Type
Lateral
Storm Sewer
Water Service
1-1/2"
Plastic
Lateral
New
Parcelld #
1514970500
$16,000.00
$0.00
$100.00 D Permit Voided I
Plan Approval
Permit Fees
Date 05/12/2006
In the perfonmance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the
easement holder(s) and to secure any nece a pprovals before starting such activity.
.;1':2 /:)7.
Address P.O. BOX 133
Signature
Date JJ~!oP
Telephone Number 920-361-1403
AgenUOwner
BERLIN
WI 54923 - 0133
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Penmit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
WATER DISTRIBUTION DATASHEET
Date: May 15, 2006
Name: HURCKMAN MECHANICAL
Project: ASSOCIATED BANK
Street: 1450 VELP AVE
Street: lOW MURDOCK AVE
City:
GREEN BAY
City:
OSHKOSH
I. ~ GaHon per minute buiding demand, predominatly Flush Tank.
2. ~ Low pressure at the Main in Street.
3. -----.1 Lb loss from a 2.0 ft difference in elevation from Main in Street to the Water Meter.
4a. 3.4 Lb loss from a 210.0 ft I 1/2" PB Tubing ASTM 3309 water service from the Main in Street to the Water Meter.
~ Pressure loss detemined using a C value of 150, inside diameter of 1.329 and a velocity of 3.5 ft per sec.
4b.~ No 2nd part water lateral.
5.~ Lbloss from a lin Meter
6. ~ Lbs of pressure available at the Water Meter. This value is entered in (B) below.
The (A) value listed below is determined by using the following formula, then rounding the result up.
A~ B-(C+~+E) x 100
A. ~ Pressure available for uniform loss (psi/IOO feet ofpipe).
B. ~ Lbs of pressure available at the Water Meter.
C. ~ Pressure needed at the controHing fixture. WATER CLOSET
D. ~ Lb loss resulting from a 34.0 ft difference in elevation from the Water Meter to the controlling fixture.
E. ------.:!! Lb pressure loss due to a no pressure loss devices serving the controlling fixture.
F. 105.0 Ft Developed length from the 70.0 ft actual length of piping from the Water Meter to the controlling fixture.
Maximun Allowable load for Copper Tube Type M, ASTM B88
Nominal Size 1/2 5/8 3/4 I I 1/4 I 1/2 2 21/2 3 4
Actual I. D. .569 0 .811 1.055 1.291 1.527 2.009 2.495 2.981 3.935
ValueofC 130 130 130 130 130 130 130 130 130 130
Velocity in ft per sec. 8 8 8 8 8 8 8 8 8 8
Maximum Gpm 5.5 0 12.5 21.5 32 45 79 121 174 303
Maximum FM WSFU 0 0 4.5 7 16 38 144 369 731 1833
Maximum FT WSFU 6.5 0 17.5 34 60 110 270 480 776 1833
Fixture Listiug
Date: May 15, 2006
Name: HURCKMAN MECHANICAL
Project: ASSOCIATED BANK
Street: 1450 VELP AVE
Street: 10WMURDOCKAVE
City:
GREEN BAY
City:
OSHKOSH
Public Use Fixtures
Hot
Cold
Total
I Drinking Fountain .00 .25 .25
2 Hose Bibb 1/2" diameter .00 6.00 6.00
3 Lavatory 1.50 1.50 3.00
1 Sink, cup .00 .50 .50 ..
I Sink, service 2.00 2.00 3.00
3 Water Closet, gravity type flush tank .00 9.00 9.00
Total Water Supply Fixture Units
3.50
19.25
21.75
15.1 Gallon per minute demand of the building. Predominatiy Flush Tank
22.6 Pressure available for uniform loss. For the table use - 23.0
Maximun AUowable load for Copper Tube Type M, ASTM B88
Nominal Size 1/2 5/8 3/4 I 1 1/4 11/2 2 21/2 3 4
Actual 1. D. .569 0 .811 1.055 1.291 1.527 2.009 2.495 2.981 3.935
ValueofC 130 130 130 130 130 130 130 130 130 130
Velocity in ft per sec. 8 8 8 8 8 8 8 8 8 8
Maximum Gpm 5.5 0 12.5 21.5 32 45 79 121 174 303
Maximum FM WSFU 0 0 4.5 7 16 38 144 369 731 1833
Maximum FT WSFU 6.5 0 17.5 34 60 110 270 480 776 1833
:::5/10/2~08 11: 24 FAX 920 499 3758 HURCKMAN MECH
* I /1 / / ^}
-' / / L- - ..........
141001/002
1953
Date: MAY 10 2006
To: RICHARD WOOD
Compauy: CITY OF OSHKOSH
Fax #: 920-236-5064
RE: ASSOCIATED BANK
From: Bruce Cartier
Pages: 1 OF 2
Messaae:
THIS IS THE PLUMBING FIXTURE LIST FOR THE BANK
3- TOILETS
3- LAVATORYS
1- DRINKING FOUNTAIN
1- CUP SINK
1- MOP BASIN
1- WATER HEATER
2- 112" OUTSIDE HOSE BIBBS
1- FLOOR DRAIN
1- SUMP PUMP
I HAVE ALSO INCLUDED THE WATER CALC. SHEET. I BELIEVE THESE
WERE NEEDED FOR THE SEWER CONTRACTOR FOR HIS PERMIT.
IF ANYTHING ELSE IS NEEDED PLEASE CALL ME.
BRUCE CARTIER 920-499-6984 EXT. 111
For any problems with this transmission, please call:
(920) 499-6984
Extension: DTI:I
Our Fax # is (920) 499-3758 Contracting Department
HURCKMAN MECHANICAL INDUSTRIES, INC. - CONTRACTOR
1450 Yelp Avenue. P. O. BOX 10977 . GREEN BAY, WI 54307-$77 . PHONE: (920) 499-8771
05/10/200811'24 FAX
920 499 3758
HURCKMAH MECH
A55 aiLllrr£D
ÔItAJK..
ð:JIIKos#
ihLJfL {)oc.1C.
N1 II-,iv .$.r.
~
WATER CALCULATION WORKSHEET
IDformotlon Ne"'ed for Water 8crvice SIzIOC:
1.
16.0
2.
52.0
J.
4.
s.
6.
7.
g.
3.0
40.9
~.
DemAod ofbu ¡Iding in gallons per mimrtc
Low pressure.,...in ¡. ",cc: (or at.-rna1,.......tank)
2.0
DilfereDeoincl...rlDnfiommam"'mctet(orWELL TANK)
1.0
Sizo ofwarermelet(ifapplicable).
Developed length 110m mam '" """'" (or""""l """"",,...k buildiug control valve).
210
INCWDING FUTURE
1.0 poiIlOO It.
1.5" LGTH:
0.0 p';¡IOOIt.
0.0 I-GTII:
0.0
Demaad of building in QPM.
Yo. M.ot Fin< Pind"" A...llabl. Pr..a... After .be W.... Meter:
6. 2.1 DemAod of building iD GPM. Bued D' ,
s....I« SI..,
-D. ,
&rvl« Size:
3,0 find P<=1'I" I... due'" elevation. ....in 10..-- ( or \VEI.L TANK)
Water mctet P"""IO I"",
A..ilabl, p""""",.tb:r IUCICf orbuilding.......lval"".
IDformnlio. Needed for W...r DI,lribDlioD Slziag:
A. 23.7 Pressure available for uniform I",s (psI/100ft.)
B.
40.9
c.
D.
E.
F.
PIPE SIZES:
MAXIMUM WR1 :
flUGh valve
Avoüable pressure oIœr = (See sæp #9. Dbove)
8.0
Pressure needed at comroUiD¡ lixlure
Conn-oiling Fixture:
8.0
I4J 002/002
Iff &£ 2.. ð Pol-
210.0 FT.
2.1rsxÐBor
FT.
0.0 PS' DROP
¡>;- iu ol<Vll1ion botw<:<n _10:....... (building couI>ol val"" on infc=d P"""'" bmk)
and controllingltxlUre oDder. 34 feel
0
Prcsoun: I"", 4ue '" a¡uipmcntwbich ..... the controlling Ilxtwe.
105
Developed length ofwarerpiping fiomwa1et 10= (bnilding 00IIIr01 va!vI: or iDlOmal
......- tank) '" _11ing Ilxtwe iu - 70 FEET X 1.5 ~
WATER PIPING SIZING SCHEDULE
105