Loading...
HomeMy WebLinkAbout0119484-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 855 GREENFIELD TRL CITY OF OSHKOSH No 119484 PLUMBING PERMIT - APPLICATION AND RECORD Owner ALAN F/MIREYA MAKURAT Create Date 05/11/2006 Contractor M P KELLY Category 411 - Residential-Water Heaters Plan Bathtub Shower Water Softner WaitSt Shamp Sink - Coffee Maker Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin - Ext Grease Trap - Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater 1 Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature ofWork replace gas water heater "check #7779 Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0613830000 Valuation $718.00 Plan Approval $0.00 Permit Fees $20.00 0 Permit Voided I Issued By Date 05/12/2006 In the perfonmance of this work. I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this penmit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST AgenUOwner OSHKOSH Wi 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.