HomeMy WebLinkAbout0119481-Plumbing (toilet)
~
OSHKOSH
ON THE WATER
Job Address 141 CHURCH AVE
CITY OF OSHKOSH
No
119481
Owner NICK AILiSA M JENSEN
Contractor M P KELLY
Category 440 - Industrial-Interior
PLUMBING PERMIT - APPLICATION AND RECORD
Create Date 05/11/2006
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Water Sollner
Local Waste
Clothes Wshr
WaitSt.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Plan
Shamp Sink -
Flr/Wst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Coffee Maker
Int Grease Trap
Ext Grease Trap -
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Gar Drain
Soda Disp
Use/Nature
of Work
r= _. ,". -0= ~"
Valuation
Issued By
Sanitary Sewer
Storm Sewer
Water Service
Size
Material
Type
#
$0.00
Permit Fees
Conn. Type
Parcelld #
0701450000
$821.00
Plan Approval
$20.00 D Permit Voided I
Address 665 N MAIN ST
Agent/Owner
OSHKOSH
WI 54901 - 4431
Date 05/12/2006
In the performance of this work. I agree to perfonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonn the work
described in this pennit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before stariing such activity.
Signature
Date
Telephone Number 231-1750
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry). your Name and Phone
Number. Unless specified otherwise. we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.