Loading...
HomeMy WebLinkAbout0119481-Plumbing (toilet) ~ OSHKOSH ON THE WATER Job Address 141 CHURCH AVE CITY OF OSHKOSH No 119481 Owner NICK AILiSA M JENSEN Contractor M P KELLY Category 440 - Industrial-Interior PLUMBING PERMIT - APPLICATION AND RECORD Create Date 05/11/2006 Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Sollner Local Waste Clothes Wshr WaitSt. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Plan Shamp Sink - Flr/Wst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Coffee Maker Int Grease Trap Ext Grease Trap - RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Gar Drain Soda Disp Use/Nature of Work r= _. ,". -0= ~" Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # $0.00 Permit Fees Conn. Type Parcelld # 0701450000 $821.00 Plan Approval $20.00 D Permit Voided I Address 665 N MAIN ST Agent/Owner OSHKOSH WI 54901 - 4431 Date 05/12/2006 In the performance of this work. I agree to perfonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonn the work described in this pennit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before stariing such activity. Signature Date Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry). your Name and Phone Number. Unless specified otherwise. we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.