Loading...
HomeMy WebLinkAbout0119482-Plumbing (lavatories) e OSHKOSH ON THE WATER Job Address 419 BOYD ST CITY OF OSHKOSH No 119482 Create Date PLUMBING PERMIT. APPLICATION AND RECORD Contractor M P KELLY Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain 2 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Roof Drain Misc. Fixtures Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn OWner THOMAS L BARLOW Category 410 - Residential-Interior Plan Wail.SI. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink - FlrlWst Sink Catch Basin Wash Ftn Urinal Coffee Maker Int Grease Trap Ext Grease Trap - RPZValve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Standp Rec Ice Maker Gar Drain Soda Disp Use/Nature of Work r.œ~-_~m Sanitary Sewer Conn. Type Storm Sewer Water Service Size Material Type # Parcelld # 0404390000 Valuation $900.78 Plan Approval $20.00 0 Permit Voided I Issued By $0.00 Permit Fees Date 05/12/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST Agent/Owner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.