Loading...
HomeMy WebLinkAbout2006-Plumbing (water heater) G OSHKOSH ON THE WATER Job Address 2420 ABBEY AVE CITY OF OSHKOSH No 119486 PLUMBING PERMIT. APPLICATION AND RECORD OWner DAVID A/JEAN SWEET REV TRUST Contractor M P KELLY Category 411 - Residential-Water Heaters Create Date ~ ptan replace gas water heater "check #7779 Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0616720000 Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater --1 Site Drain Roof Drain Misc. Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Use/Nature ofWork Valuation $665.00 Plan Approval Issued By Water Softner - Wail.SI. Shamp Sink - Coffee Maker Local Waste Ice Chest FlrlWst Sink - Int Grease Trap Clothes Wshr Exam Sink Catch Basin - Ext Grease Trap - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp $0.00 Permit Fees $20.00 D Permit Voided I Date~ In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you pertonm the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST Agent/Owner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.