Loading...
HomeMy WebLinkAbout0119465-Building (create bedrooms) 0 OSHKOSH ON THE WATER Job Address 1061 DURFEE AVE CITY OF OSHKOSH No 119465 BUILDING PERMIT -APPLICATION AND RECORD OWner LARRY L PAULSON Create Date 05/11/2006 Designer Contractor OAKRIDGE HOMES LLC Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement - Sq. Ft. Rooms Height Finished/Living - Sq.Ft. Bedrooms Stories Garage - Sq.Ft. Baths Ft. D Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFRIlnstalling two closets to divide the existing living room into two bedrooms. Smoke detectors will be installed to meet min. code of Work requirements. Heat and return are existing and located in each room. HVAC Contractor Plumbing Contractor Electric Contractor Fees: valua~ Issued By: $2,000.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 05/11/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0607100000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, it you perform the work described in this permit application within an easement, the City strongiy rges the permit applicant to contact the easement holder(s) and t? secur any nece ry approvals bet tartLng such ivity. Signature DaterS-rf- NEENAH """!.. 54956 - 0000 Telephone Number 277-4031 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.