Loading...
HomeMy WebLinkAbout0119435-Building (roof) e OSHKOSH ON THE WATER Job Address 801 E NEW YORK AVE CITY OF OSHKOSH No 119435 BUILDING PERMIT - APPLICATION AND RECORD Owner JERRY G/PAULA E STEGER Create Date 05/10/2006 Designer Contractor HICKEY ROOFING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement _Sq.FI. - Sq. Ft. Rooms Height Ft. 0 Projection I Canopies Finished/Living Bedrooms Stories Garage _Sq.FI. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Park Dedication Not Required Flood Plain ~ # Dwelling Units ----------.c> Height Penmit Not Required # Structures ----------.c> Use/Nature ßFRI Tear-off roofing, install new wood decking and roofing on house and carriage house - No structural changes. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $20.340.00 Plan Approval $0.00 Penmil Fee Paid $127.00 Park Dedication $0.00 Issued By: Date 05/10/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1109620000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no autl1ority to enforce easement restrictions of which It is not a party. If you perform the work described in tI1is permit application witl1in an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1427 BROAD ST Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 426-4008 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.