HomeMy WebLinkAbout0119454-Plumbing (fixtures)
e
OSHKOSH
ON THE WATER
Job Address 2347 MOUNT VERNON ST
Contractor MOREMAN PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
119454
Owner JAMES NRAE UN DRIESSEN JR
Create Date 03/27/2006
Category 410 - Residential-Interior
Plan
Bathtub 0 Shower 0 Water Sollner 0 Wait.S!. 0 Shamp Sink 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0
Lavatory 1 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0
Toilet 1 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0
Res. Sink 1 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 PlasterSink 0 Standp Rec 0
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Coffee Maker ------2
Int Grease Trap ------2
Ext Grease Trap ------2
RPZValve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
-~. r"
of Work
Size
Material
Type
#
0
0
0
0
0
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1517230000
Valuation $1.200.00
Issued By /);J L\!J
Plan Approval
$0.00
Permit Fees
$21.00 0 Permit Voided I
Date 05/10/2006
In the performance of this work. I agree to perform ali work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictons of which it is not a party, if you perform the work
described in this permit application within an easement, the City stronglý urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 1325
AgenUOwner
OSHKOSH
WI 54903 - 0000
Telephone Number 231-9191
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.