HomeMy WebLinkAbout0120038-Plumbing (interior)
G CITY OF OSHKOSH
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 580 S KOELLER ST Owner RIVER VALLEY ONE LLC
Contractor O'NEILL ENTERPRISE INC Category 440 - Industrial-Interior
Bathtub Shower Water Softner Wait. St.
Whirlpool Floor Drain 20 Local Waste Ice Chest
Lavatory 4 Lndry Tray Clothes Wshr Exam Sink
Toilet 7 Disposal Bidet Sculry Sink
Res. Sink Dishwasher Beer Tap Hand Sink
Bar Sink Sump Pump Lab Sink Plaster Sink
Water Heater 1 Classrm Sink Sterilizer Surgeons Sink
-
Site Drain 23 Breakrm Sink Dip Well F Prep Sink
Roof Drain Ejector/Grind Drink Ftn Serv Sink
Misc. 3 HOSE BIBB
Fixtures
3
2
Shamp Sink
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
No 120038
Create Date 06/14/2006
Plan G2-195-0606-P
3
1
2
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
2
1
INTERIOR PLUMBING FOR GOLDEN CORRAL ""DEBIT ACCT
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
0611620000
Use/Nature
of Work
Valuation
$93,900.00 Plan Approval
$0.00 Permit Fees
Issued By
$518.00 D Permit Voided I
Date 06/14/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W 6TH AVE
OSHKOSH
WI 54902 - 0000 Telephone Number 920-230-2007
To schedule inspectio!1s please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.