Loading...
HomeMy WebLinkAbout0120038-Plumbing (interior) G CITY OF OSHKOSH OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 580 S KOELLER ST Owner RIVER VALLEY ONE LLC Contractor O'NEILL ENTERPRISE INC Category 440 - Industrial-Interior Bathtub Shower Water Softner Wait. St. Whirlpool Floor Drain 20 Local Waste Ice Chest Lavatory 4 Lndry Tray Clothes Wshr Exam Sink Toilet 7 Disposal Bidet Sculry Sink Res. Sink Dishwasher Beer Tap Hand Sink Bar Sink Sump Pump Lab Sink Plaster Sink Water Heater 1 Classrm Sink Sterilizer Surgeons Sink - Site Drain 23 Breakrm Sink Dip Well F Prep Sink Roof Drain Ejector/Grind Drink Ftn Serv Sink Misc. 3 HOSE BIBB Fixtures 3 2 Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp No 120038 Create Date 06/14/2006 Plan G2-195-0606-P 3 1 2 Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs 2 1 INTERIOR PLUMBING FOR GOLDEN CORRAL ""DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0611620000 Use/Nature of Work Valuation $93,900.00 Plan Approval $0.00 Permit Fees Issued By $518.00 D Permit Voided I Date 06/14/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W 6TH AVE OSHKOSH WI 54902 - 0000 Telephone Number 920-230-2007 To schedule inspectio!1s please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.