HomeMy WebLinkAbout0119452-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 3238 ISAAC LN
CITY OF OSHKOSH
No
119452
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor SOPER PLUMBING
Category 410 - Residential-Interior
Owner GARRY H DECKER & CO LLC
Create Date 05/10/2006
Plan
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Shower
Floor Drain
~
1
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Roof Drain
Misc.
Fixtures
1 Water Softner
Local Waste
Clothes Wshr
Wait St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Shamp Sink -
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Coffee Maker
Int Grease Trap
Ext Grease Trap -
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Gar Drain
Soda Disp ---i
Use/Nature
of Work
l~"'~ M,""~ """
Sanitary Sewer
Size
Material
Storm Sewer
Water Service
Type
#
Conn. Type
Parcelld #
1416584700
Valuation
$1,500.00
/?;)4.::;
Plan Approval
$21.00 D Permit Voided I
Issued By
$0.00
Permit Fees
Date 05/10/2006
in the performance of this work, i agree to perform all work pursuant to rules governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2225 BURNWOOD DR
Agent/Owner
OSHKOSH
WI 54902 - 0000
Telephone Number 426-2151
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.