HomeMy WebLinkAbout0119444-Building (patio)
e
OSHKOSH
ON THE WATER
Job Address 1110-1120 BAUMAN ST
CITY OF OSHKOSH
No
119444
BUILDING PERMIT. APPLICATION AND RECORD
Owner W R& S J GAYHART/K C&M A RASMUSSEN Create Date
05/10/2006
Designer
Contractor
OWNER
Category
142 - Decks, Patios, Ramps
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
_Sq. Ft.
_Sq.FI.
Rooms
Height
Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
_Sq.FI.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Siab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain -
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
-------2
Use/Nature CONDOS/ Constructing a 14'x30' patio 011 of 1110 Bauman and a 10'x20' patio 011 of 1120 Bauman. The patios are to be a minimum of
of Work 5' from the high water mark.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$2,000.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Date 05/10/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1608680100
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement
:~~~:::::nd ÿïcu~;::r¿e~?-=Vi~ Date "-'.0 5 !ro~txþ
Ag OWner l7T
Address 1920 CLiFFViEW CT OSHKOSH WI 54901 - 0000 Telephone Number Condo'
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.