Loading...
HomeMy WebLinkAbout0119444-Building (patio) e OSHKOSH ON THE WATER Job Address 1110-1120 BAUMAN ST CITY OF OSHKOSH No 119444 BUILDING PERMIT. APPLICATION AND RECORD Owner W R& S J GAYHART/K C&M A RASMUSSEN Create Date 05/10/2006 Designer Contractor OWNER Category 142 - Decks, Patios, Ramps Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement _Sq. Ft. _Sq.FI. Rooms Height Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies Garage _Sq.FI. Baths Signs Foundation . Poured Concrete 0 Floating Siab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain - Height Permit Park Dedication # Dwelling Units 0 # Structures -------2 Use/Nature CONDOS/ Constructing a 14'x30' patio 011 of 1110 Bauman and a 10'x20' patio 011 of 1120 Bauman. The patios are to be a minimum of of Work 5' from the high water mark. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $2,000.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 05/10/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1608680100 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement :~~~:::::nd ÿïcu~;::r¿e~?-=Vi~ Date "-'.0 5 !ro~txþ Ag OWner l7T Address 1920 CLiFFViEW CT OSHKOSH WI 54901 - 0000 Telephone Number Condo' To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.