HomeMy WebLinkAbout0119408-Plumbing (water heater)
0
OSHKOSH
ON THE WATER
Job Address 2026 MENOMINEE DR
CITY OF OSHKOSH
No
119408
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor O'NEILL ENTERPRISE INC
2 Shower
Floor Drain
~
7
~
1
~
1
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Bathtub
Whirlpool
Lavatory --2
Toilet 5
Res. Sink 1
Bar Sink 1
Water Heater ~
Site Drain
Roof Drain
Misc.
Fixtures
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
4 HOSE BIBB
Sterilizer
Dip Well
Drink Ftn
Owner ANDREW & ARTHUR 0 DUMKE/RANDALL SC~ Create Date 05/09/2006
Category 410- Residential-Interior
Plan
Wait.St.
Ice Chest
1 Exam Sink
Sculry Sink
Hand Sink
Shamp Sink -
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Coffee Maker
Int Grease Trap
Ex! Grease Trap -
RPZ Valve
Eye Wash Statn
2 Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Use/Nature
ofWork
r'ffi ~ .,~, "~~" 'mIT ~
Size
Sanitary Sewer
Storm Sewer
Water Service
Material
#
Conn. Type
Type
Parcelld #
1511880000
Valuation
$30,000.00
$0.00
Permit Fees
$280.00 0 Permit Voided I
Plan Approval
Date 05/09/2006
Issued By
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforoe easement restrictions of which it Is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any neoessary approvals before starting such activity.
Signature
Date
Address 522 W 6TH AVE
AgenUOwner
OSHKOSH
WI 54902 - 0000
Telephone Number
920-230-2007
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.