HomeMy WebLinkAbout0119392-Plumbing (toilet)
e
OSHKOSH
ON THE WATER
Job Address 426 W SOUTH PARK AVE
Contractor DR GLAZE PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
CITY OF OSHKOSH
No
119392
PLUMBING PERMIT - APPLICATION AND RECORD
Shower
Floor Drain
Lndry Tray
1 Disposal
Dishwasher
Owner CYNTHIA J SPICZENSKI Create Date 05/08/2006
Category 410 - Residential-Interior Plan
Water Softner Wail. 51. Shamp Sink Coffee Maker
~
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap ~
Bidet Sculry Sink Wash Ftn RPZValve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
Sump Pump
Classrm Sink
Breaknm Sink
Ejector/Grind
Use/Nature REPLACE 2ND FLOOR WATER CLOSET "CHECK #4001
of Work
Valuation
Issued By
Size
Material
Type
#
Conn. Type
Sanitary Sewer
Stonm Sewer
Water Service
Parcelld #
0906940000
$300.00
$0.00
$20.00 D Permit Voided I
Plan Approval
Permit Fees
Date 05/08/2006
In the performance of this work, I agree to perform all work pursuant to nules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described In this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address 1865 JAMES RD
Date
Agent/Owner
OSHKOSH
WI 54904 - 0000
Telephone Number
920-589-4014
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.