Loading...
HomeMy WebLinkAbout0119392-Plumbing (toilet) e OSHKOSH ON THE WATER Job Address 426 W SOUTH PARK AVE Contractor DR GLAZE PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures CITY OF OSHKOSH No 119392 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray 1 Disposal Dishwasher Owner CYNTHIA J SPICZENSKI Create Date 05/08/2006 Category 410 - Residential-Interior Plan Water Softner Wail. 51. Shamp Sink Coffee Maker ~ Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap ~ Bidet Sculry Sink Wash Ftn RPZValve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Sump Pump Classrm Sink Breaknm Sink Ejector/Grind Use/Nature REPLACE 2ND FLOOR WATER CLOSET "CHECK #4001 of Work Valuation Issued By Size Material Type # Conn. Type Sanitary Sewer Stonm Sewer Water Service Parcelld # 0906940000 $300.00 $0.00 $20.00 D Permit Voided I Plan Approval Permit Fees Date 05/08/2006 In the performance of this work, I agree to perform all work pursuant to nules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 1865 JAMES RD Date Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 920-589-4014 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.